Our Projects
From small rural boreholes to large-scale commercial irrigation networks — every project we deliver is a testament to scientific precision and engineering excellence.
Browse a selection of our completed engineering projects. Each case study represents a unique engineering challenge solved with precision and care.
Borehole Drilling
120m borehole serving a 400-hectare tobacco farm. Geophysical survey identified a high-yield aquifer delivering 12,000 litres/hour.
Solar Water Pumping
Solar pumping system drawing from Lake Malawi, distributing 50,000 litres/day to a horticultural estate with zero diesel operating cost.
Irrigation System
260-hectare precision drip irrigation system serving a sugarcane estate, reducing water consumption by 40% versus flood irrigation.
Solar Power Backup
100kW solar backup system with millisecond switchover protecting critical hospital equipment, cold storage, and surgical theatres 24/7.
Water Infrastructure
500,000-litre elevated steel tank tower with gravity-fed automated distribution network serving a residential estate of 120 units.
Borehole Drilling
8 community boreholes drilled across Dedza district schools providing safe drinking water to 4,500+ students and faculty members.
Contact us today for a free site assessment and join 150+ satisfied clients across Malawi.
Leading Provider of Sustainable Water & Energy Solutions
© 2007–2026 Mphamvu Ya Dzuwa Solution (MDS). All Rights Reserved.
Developed by Oasis Hub Malawi.